Beebo Solar Farm & Battery Energy Storage System

Construction of a 600 MW solar farm with a 400 MW battery storage system.

$0.9B Planned

Solar Farm

Belah Bess

Battery energy storage system (400 mw / 1, 600 mwh), battery containers.

$250M Planned

Hopeland Solar Farm

250 mw solar arrays, 312 mwdc / 250 mwac solar pv modules, laydown areas.

$300M Planned

Solar Farm

Tumuruu Taromeo Solar Farm

400 MW solar farm. Solar photovoltaic panels. Battery energy storage system. Grid connection

$300M Planned

Solar Farm

Brigalow Peaking Power Plant

400 mw power plant, 12 gas turbines, 275kv transmission line.

$520M Committed

Hydrogen Processing Facility

Goombi Renewable Energy Hub

800 MW wind farm. 107 wind turbines. Maximum blade tip height of 275m. Wind monitoring masts

$1.2B Planned

Wind Farm

Tarong West Wind Farm

550MW wind farm that can power up 230,000 homes. Approximate location

$1.5B Planned

Wind Farm

Jackson North Wind Farm

99 wind turbines, 8 mw wind turbine x 270 m tip height, 1 permanent meteorological (met) mast.

$1B Planned

Wind Farm

Bungaban Wind Energy Project

Proposed 600MW wind farm (120 turbines) plus potential battery storage

$3.9B Planned

Wind Farm

Forest Wind Farm Project

200 mw wind farm, up to 226 wind turbines, overhead transmission corridor (otc) (60 m wide x 65 km long).

$2B Planned

Wind Farm

Stony Creek Wind Farm

Wind farm- 110MW

$300M Planned

Wind Farm

Bullyard Solar Farm

109 MW solar farm

$180M Planned

Solar Farm

Theodore Wind Farm

Wind farm, 170 wind turbines, 240 mw battery energy storage system.

$500M Planned

Wind Farm

Kensington Solar Farm

42 MW Solar farm (147,840 panels)

$75M Planned

Solar Farm

Innes Park Solar Farm

25 mw solar farm, 72 polycrystalline silicon solar panels, central inverters.

$755M Planned

Solar Farm

Banana Range Wind Farm

280 MW wind farm. 50 wind turbines (250 M). Large scale battery system. Overhead & underground cabling works

$350M Planned

Wind Farm

Smoky Creek Solar Farm

Solar station that will stretch across approximately 1,800 hectares of cleared land with a planned output of 1,194,000 MWh per annum.

$550M Committed

Solar Farm

Central Queensland Hydrogen Project (CQ-H2)

Hydrogen electrolysis demonstration plant (3 gw). Loading terminal. Associated works. Underground hydrogen storage

$12.4B Planned

Hydrogen Processing Facility

Upper Calliope Solar Farm

Construction of a 1.1 gigawatt solar farm.

$1.7B Planned

Solar Farm

Rio Tinto Gladstone Aluminium Smelter

4gw solar & wind farms, solar photovoltaic panels, wind turbines.

$8B Planned

Solar Farm

Pleasant Hills Solar Project

Solar farm

$150M Planned

Solar Farm

FFI / Plug Power - Global Green Energy Manufacturing Centre

Multi-gigawatt green hydrogen-equipment manufacturing facility, associated civil work stage 1, 2 gw of hydrogen production facility.

$1B Underway

Hydrogen Processing Facility

Gladstone Sda Energy Hub

Battery energy storage system (bess), 780 mw battery energy storage system, 200 bess units.

$50M Planned

Mount Hopeful Wind Farm

700 MW wind and 400 MW battery storage

$100M Planned

Wind Farm

Barcaldine Renewable Energy Zone (Brez)

Wind farm

$120M Planned

Wind Farm

Capricorn Battery Energy Storage System

300 mw / 1.2 gwh battery energy storage, battery modules, control components.

$450M Planned

Supernode North Bess and Substation

780 mw bess, substation, water management area.

$30M Planned

Boomer Green Energy Hub

Wind farm. 150 wind turbines. Substation. Battery storage facility (1 gw)

$3B Planned

Wind Farm

Dysart Solar Energy Farm

A large-scale solar farm with 360,000 panels.

$200M Planned

Solar Farm

Peak Downs Mine Power Line Realignment Project

3 existing 66 kv power lines (7n, clearing, 10 m wide access track (temporary.

$30M Planned

Hydrogen Processing Facility

Isaac Power Station

Gas fired power station. 2 aeroderivative gas turbines (60 MW each). 2 generators. Construction facilities

$1B Planned

Hydrogen Processing Facility

North Creek Solar Farm

A solar farm.

$50M Planned

Solar Farm

Burrenbring Battery Energy Storage System

1 gw lithium-ion (lithium iron phosphate) battery units, substation (up to six 200 mva 275/33 kv transformers), fire detection & monitoring systems.

$100M Planned

Karma Wind Farm

An 88-turbine wind farm.

$500M Planned

Wind Farm

Wongalee Wind Farm

4 GW wind farm. Wind turbines. Wind monitoring mast. Electrical cabling

$30M Planned

Wind Farm

Prairie Wind Farm

800 MW wind farm. 100 wind turbines. Wind monitoring mast. Electrical cabling

$30M Planned

Wind Farm

Collinsville Green Energy Hub

3 gw hydrogen production facility, structural & mechanical works, bulk earthworks.

$15B Planned

Hydrogen Processing Facility

Proserpine Wind Farm

900 mw wind farm, 166 wind turbines, wind monitoring mast.

$500M Planned

Wind Farm

Burdekin Solar Farm

Solar Farm

$220M Planned

Solar Farm

Koberinga Solar Farm

55 MW solar farm. Solar photovoltaic panels. Solar mounting & racking structures. Battery energy storage system

$82.5M Planned

Solar Farm

Copperstring 2032

New 1, 100 km overhead high-voltage electricity transmission line connecting north west minerals provence & mt isa to national electricity market grid, 330 kv transmission line (803 km).

$14B Planned

Hydrogen Processing Facility

Windlab Mount Fox

Aims to establish a renewable energy facility through a wind farm and battery energy storage system.

$1.5B Underway

Wind Farm

Edify Energy - EGH2 Hydrogen Plant

Hydrogen Plant

$290M Planned

Hydrogen Processing Facility

Yabulu South Bess

200 mw / 800 mwh battery energy storage system, lithium iron phosphate (lfp) battery units, inverter stations.

$200M Planned

Yabulu Solar Farm

Solar PV modules. Single axis mounting framework for trackers. Inverters. Medium voltage step-up transformers

$100M Planned

Solar Farm

Sunshine State Solar Farm

110 MW solar farm

$210M Planned

Solar Farm

Forsayth Wind Farm

Ultimate export capacity of 75mw approx wind farm. UP to 30 wind turbines. Connect via overhead transmission lines into georgetown to ross 132kv feeder

$230M Planned

Wind Farm

Chewko Solar Farm

75 MW solar farm. Approx 200,000 solar photovoltaic panels (max height approx 5 M). Solar mounting & racking structures. Electrical cabling

$100M Planned

Solar Farm